Posted on August 28, 2009 by novakurniawan
Somebody told me that he wanted to find a total gain in a closed-loop control system. He mentioned about he need to find Gain on Transmitter, Gain on Control Valve, Gain on The Control System, and Gain in the Plant to know whole system gain. Some of the gain on above items I’ve been familiar already; [...]
Filed under: Engineering | Tagged: Control Valve Gain, Gain, Process Gain, Proportional Band | 3 Comments »
Posted on August 26, 2009 by novakurniawan
After a discussion with a friend who tried to adjust volume in his wet-reference leg LT, I think I need to make underline for DP type LT case that may cause many understanding. Probably I am wrong or pre-assumed that some people have different opinion, but sometime I found little bit dispute one another on below DP case. However let’s discuss about [...]
Filed under: Engineering | 5 Comments »
Posted on August 12, 2009 by novakurniawan
Thread is never become a main concern of instrument engineer (as I am =:p), because the knowledge of thread connection is the expertise of mechanical engineer and or piping engineer since they are more familiar about “mesin bubut” to make the thread than any instrument engineers do. However sometime Instrument Engineer needs to specify and select the thread for instrument [...]
Filed under: Engineering | Tagged: BSP, BSPP, BSPT, NPT, SAE | Leave a Comment »